Thursday, August 1, 2019

August 1, 2019 ASD Board Study Session

After a marathon Study Session today, I would like to get out some of the information we were given today, but I'm a little fried. So I think I will try to just give a summary.
First we discussed the bond funding issue. We will be issuing the last set of bonds (phase four) from the 2016 bond election in the next few months. Those bonds will be for $73 million. $33 million of those funds are already spoken for in finishing current projects. That leaves us with $40 million. The original project list included one middle school and two elementary schools for phase four. The last few projects have gone around 10% over the 2016 projected costs. This has been caused by a significant and unprecedented increase in construction and property acquisition costs. There has also been an increase in all of the items needed to fill the schools: supplies, furniture, etc. A middle school will cost $40-45 million, while elementary schools are about $18-19 million.
When the bond project costs were projected, we DID project for an increase in construction costs. But the increase has been significantly higher than projected, and we have simply not been able to keep up with it. This leaves us with a difficult decision. We cannot build all of those schools without exploring alternative funding options.
Public feedback from the survey we sent out last spring was very clear. We have been asked to explore all options before raising taxes. So after talking about the bond funding issue, we discussed four possibilities we could explore to utilize our buildings better (some could be explored for elementary as well):
1- change High Schools to 9-12 grade format
2- change boundaries, district wide
3- year round school schedule- even in secondary- possibly with a 5th term in the summer
4- add 0 period or 5 period to each school day
Most of the rest of the meeting was spent discussing Option 1, and answered a lot of the questions I had about it. I really appreciated Asst. Superintendent Rhonda Bromley for all the time she spent researching for us. There are pros and cons to 9-12 high schools. The research about academic performance between the two formats (10-12 vs 9-12) does not show an advantage to one or the other. There is research showing that smaller schools can help students have a better academic performance, but in our district the larger schools seem to have a better academic success rate (Westlake, our largest school last year, had the highest percentage of participation in Concurrent Enrollment and AP classes and had the best test scores in the district). After forecasting farther in the future, it is unlikely that, in the long run, we would see any significant financial savings from the change.
We also went through surveys from the parents at Skyridge HS (9-12) and from Lehi Jr High (7-8). 75% of the respondents from both surveys were happy with the format of their schools and preferred to stay with the current format.
It's clear that Skyridge parents are very happy with their 9-12 school. But we might see similar numbers if we were to survey our 10-12 grade school parents. So I don't know that we really have a strong reason to switch our schools from their current format. It might be that some schools do the 9-12 format and others do 10-12. I'm not sure. I don't think there was any type of consensus with the information that we received today.

Tuesday, June 25, 2019

June 18 ASD Board Meeting- Budgets

The June 18th ASD Board Meeting was a long one with a lot of business.  The two biggest things that were approved were the 2018-2019 Final Budget and the 2019-2020 Tentative Budget.

Other items included recognition of the LPHS Girls Golf team: 6A State Champions, The LPHS Boys Tennis Team: 6A State Champions, and the LPHS Girls Track team: 6A State Champions!  I was reminded that there are entire districts who do not have that many State Championships in a year, and this is an amazing accomplishment for our Knights.  I am grateful for the coaches and parents who help these students succeed.  Congratulations to all of them for their achievements!

We also approved a 9 acre property purchase in Saratoga Springs (future Elementary School site), declared a trailer and two vehicles excess (to be sold), and approved the sale of the CTE home in Lehi.  For those who do not know about our CTE Building program, it is an AWESOME program.  We have two classes, both made up of students from multiple High Schools.  These students give up FOUR credits (two classes each day), and they build a home.  ALL of it.  They do the foundations to the roof, the painting and tile work, the electrical, the framing- everything.  When the home is finished (and they are BEAUTIFUL), it is sold to provide the resources needed to continue the program.  The program is self-sustaining.  Many of these students graduate with job offers in hand to work in trades because of the significant experience they have already had.  The teachers make sure that every detail is done perfectly.  These homes typically sell above their asking price because of all the beautiful extra work the students do in them.

Back to the Budget: It is a daunting task to approve a budget that is 923 MILLION Dollars.  I spent a lot of time going over the budget, asking questions and thinking about what to do.  The Tentative Budget includes a two increment increase in our property tax rate, and we will be holding a Truth In Taxation hearing in August (on the 13th) to hear from the public about it.  I want to explain why I feel that it is necessary.

There are a couple of legislative requirements that tie yearly property tax increases to our state funding.  If we do not raise taxes one increment each year, we lose some of our state funding.  One of these is the new TSSA (Teacher & Student Success Act).  In my conversations with legislators this last session, most of them were very clear that they feel that School Districts need to take on the burden of raising taxes if they need more funding, and not ask the legislators for additional money.  This is hard, considering that there is a lot of inequity in how funding is allocated in the state, and ASD is near the bottom for average funding per student.  (Below the majority of districts, and also below what charter schools get).

This year, some of the other districts have put forth significant raises in teacher salaries.  I believe we have the best teachers around, and it is a top priority for the ASD Board to "Recruit, Retain and Reward" our good teachers.  So we felt that a significant salary increase was needed this year to meet that goal, and to provide a competitive salary for our teachers.  The additional 2 increments on property taxes will equate to about $3 a month on the average ($317,000 value) home.  This increase is going entirely to salaries.  We are also putting the maximum allowed percentage from the TSSA (25%) toward teacher salaries.  Between the two, we are able to give our employees a 5.8% raise this year.

I hope that this shows the confidence in and concern for our teachers that is felt by the board and administration, while still balancing the need to be frugal and prudent with tax funds.  I am constantly aware of the burden that property taxes place on those who struggle financially in our community.  Property taxes are a regressive tax and I don't like that they are the only tool the school board has been given to increase funds.  (in fact, we will LOSE funding if we do not raise property taxes slightly EVERY year.)  I would much prefer a small income tax increase to raise the needed funds, as more income usually means more means with which to pay taxes.  A higher property value does not necessarily mean that a citizen has more money with which to pay that property tax.

Tax Reform: Its coming to you!

One of the big things happening this summer that could have a significant effect on our schools is the Legislative interim meetings about Tax Reform.  The legislature is currently wrestling with a big problem: revenue in the General Fund is not keeping up with the need for that funding.  So they are trying to decide how to fix the difference.  Depending on how this is done, funds could be pulled from the Education fund (income tax revenue), or they could change the constitutional restriction that only allows those funds to be used for schools. 

I don't envy our legislators the task that this will be to decide.  But meanwhile, I continue to be concerned that we make sure that the Education budget is not negatively impacted while we work to fix our other budget issues. 

The Tax Reform and Equalization Task Force is holding community meetings to gather input from community members.  The closest one in our area is being held on July 30th at 6 pm at Silicon Slopes/UTC, 2600 Executive Parkway, Ste 140, Lehi, UT 84043 - Map this!).

If you would prefer to attend one of the other open houses, you can find them here:  https://le.utah.gov/asp/interim/Commit.asp?year=2019&com=TSKTRE

Monday, May 20, 2019

2019-05-14 ASD Study Session and Board Meeting

Study Session started early on the 14th, at 3:30.  This was because we had two different patron surveys to go over.  The first one was a survey by Hanover Research that asked our employees about their working conditions.  Their main findings recommended the following: 1- Support teachers in responsibilities that exceed the number of hours in the workday; 2- professional development & Support are needed.  Particularly tech use and differentiating instruction; 3- Clear messaging & implementation of the "Vision for Learning"; and 4- anti- harassment initiatives should be included.

As we went through the survey responses, we saw many different areas where administrator feedback differed from teacher feedback.  It was helpful to see where those areas were.  teachers indicated significant stress with their workloads, especially the amount of work that needed to be completed outside of the work day.  Classified Employees understandably did not feel that was much of an issue, and Administrators were less concerned than teachers.  Compete survey results can be found here:  https://mail.google.com/mail/u/0/#inbox/WhctKJVRJDhlqdmCjpWtfMxsPLlhXQwbgGVCWLxHtjsZNVQbdNGTSWdpXtHmpzbtswLlZxq?projector=1&messagePartId=0.3 

The second survey was done by Y2 Analytics, and it was a parent survey asking for feedback about how they felt about the district.  This one was fascinating to me.  We received nearly 1500 responses, which was 11% of the surveys sent out.  This is apparently a great turnout.  The margin of error was 3%.  In general the parents in the Orem High Cluster are the most satisfied with the district- in nearly every category surveyed.  Our Music Programs and Clear Creek are our most popular programs.  84% of our patrons are "Extremely" or "Somewhat" Satisfied with their children's schools. I am looking forward to re-reading the survey and have asked that the Lone Peak area answers be given to me so that I can dive into them a little deeper.

For the last part of Study Session, we discussed Tax Increment Financing and the specifics of Project Mockingbird.  I've already posted my thoughts on that, so I don't think I need to keep discussing it.  I was grateful to our negotiation team for working with Eagle Mountain City and the developer to help make this more palatable to ASD.

After that discussion, we moved into our board meeting.  Which was VERY long.  We had a significant number of recognitions- including the Teacher and Employee of the year winners for each cluster.  We approved all of the routine business.  We also approved a property purchase in Eagle Mountain that will allow us to build a new elementary school to alleviate the crowding at Brookhaven.

One of the bigger items for the evening was the approval of all of the Trust Land Plans for each individual school.  Board members are required to approve the plans for their schools, and it took some time to read through all of them.  Usually they were just fine as is, but I did find a couple of things that needed to be changed.  By Board Meeting, though, they were all in compliance and we approved all of them.

Our Employee Contracts for the 2019-2020 school year were next on the agenda.  We approved a 5.8% raise for all of our teachers and Classified employees.  There were also several changes to salary structures.  Board Member Sara Hacken commented that this was the best package she had ever seen for our teachers.  The entire package is very competitive with the surrounding districts.  All the contracts were approved.

The last action item was the approval of the Eagle Mountain CRA, called Project Mockingbird.  I believe that in the end we came to an agreement that is beneficial for the students of ASD, and that is the reason that I voted for it.

The final item on the agenda was a discussion about the 2020-2021 school calendar.  Recently we switched our Term/Semester schedule in our secondary schools, and now first term ends before Fall Break and the Semester break comes before Christmas.  This has created a significant difference in the number of days in each term, which has been a problem for some of our secondary teachers.  In an attempt to remedy this, the calendar committee put together an option that evens the terms out- but it requires doing away with Fall Break.  The feedback on this idea that I have heard has been almost universally negative.  The board members also were not in favor of this.  So I don't believe that option is even in the running.  We will discuss further and vote on the calendar at our June 18th meeting.

After that, we headed into a very long Closed Session where we discussed personnel issues.  And that wraps it up!

May 6-17 Update

The first week was about celebrating some of our fantastic employees.  On Tuesday night the 7th, I attended the AAA (Alpine Administrator Association) retirement dinner at Thanksgiving Point.  We are lucky to have some of the best administrators in the country in Alpine District.  It was a beautiful evening and I appreciated learning more about Rex Becker (Principal at Eaglecrest Elementary), Jess Christen (Administrator of Operations) and Tom Mason (Director of Purchasing).  Each of these men have served the students of Alpine School district in many capacities over many years.  We are so grateful for their service.

On Friday the 10th, I attended the AEA (Alpine Education Association) dinner, held at Westlake High School.  I was grateful to hear about all the amazing teachers being honored.  We have teachers who have taught for more than 30 years that are retiring this year.  It was so fun to hear all the great things they are doing and about the schools and communities they have served.

That was pretty much all for the 6-10th, but the 13-17th was a CRAZY week, so it more than made up for the slow week.  The whole week is the week I affectionately call "Concert Week," since there are concerts at each of our secondary schools every night.  I'm not sure why they all end up being the same week, but they always are.  My own children are heavily involved in the fine arts, so I mostly attended their concerts.  Monday was a Percussion Concert at LPHS, Wednesday was the joint MRJH/LPHS Orchestra concert and Thursday was a Band Concert at MRJH.  I know that TMS, MRJH and LPHS all had concerts every night that week.

Tuesday the 14th was a marathon day.  I missed the band concert at LPHS because of Study Session and Board Meeting.  I also attended Superintendent Meeting in the morning, at River Rock Elementary.  They are doing some great things at River Rock.  I asked about what they do when teaching Utah History to their classes, and they have some great ideas of fun and interesting things they do.  One thing I was especially impressed by was that the teachers have a journal for every student, and they write back and forth with the student on a weekly basis.  They talked about how they are able to understand their students needs and concerns much better.  And the parents really appreciate the extra time that the journals take.  Brian Ridge has been the principal at River Rock for about a year, and he is establishing a great culture there.  The teachers enjoy working with him.  Their Innovative Learning Coach, Jeff Mortensen, was also present, and I appreciated learning from him and from the 4th grade team about how they work together to find ways to have technology enhance the learning experience.  Another thing Jeff can help with is student data privacy.  Rather than teachers looking for an app that will do what they are wanting it to, and just grabbing the cheapest one, Jeff can research multiple options and find out which ones are safest for students to use, and would meet the need best.  He can then help them with the implementation so they don't have to spend so much extra time learning multiple different programs.  He stressed that his job is to help the Teacher FIRST- he is an "innovative learning" coach, not a "Technology" coach. Many times that innovative learning is best done WITHOUT technology.  Video of our visit will be posted on the ASD YouTube channel as soon as it is ready.

After the teachers left, we had an opportunity to meet about the Tax Increment Financing proposal that we had received- Project Mockingbird.  I already posted my notes about that process, so I will just say that I appreciated the Superintendent and Asst. Superintendent Smith giving those of us in attendance the opportunity to ask a lot of questions about the process, what our criteria are, and what we were looking at with this particular project.

Study Session started at 3:30 on Tuesday, with Board Meeting and then a closed session immediately following.  I will post that information in another post.  

Wednesday, May 15, 2019

May 14 Board Meeting- Project Mockingbird

The biggest decision from last night's marathon Board Meeting was the tax break approved for an Eagle Mountain Company.  I wanted to give the Lone Peak area patrons some ideas about why I supported this, even though we don't have any similar deals in our area. 
TIF, or Tax Increment Financing, can come in many forms- CDA, RDA, EDA, URA- they all basically mean that a developer is given a property tax break on a new development of some type. Usually this tax break encourages a developer to build the project, and protects them somewhat from the risks associated with a new development, encouraging them to build even if there is some risk.   Since ASD collects 60% of the property taxes in our area, our approval is critical to the deal.  We have criteria that we follow before we will look at these proposals- ie we only allow a certain percentage to be refunded per city, we don't approve TIF for residential developments, we don't approve TIF for retail projects, etc. Exceptions can be made for these guidelines, but usually we would ask for significant concessions from the company to make an exception. Some notable examples of previously approved CDA/RDAs are the IM Flash/Micron development, the Woodbury development that is currently improving the University Mall; Thanksgiving Point, and most recently, the new Facebook facility in Eagle Mountain.
The main things I don't like about TIF are that (1) we tend to give them to large developments, which seems to favor large companies over small ones, and (2) most of the numbers we use to decide these deals are all future numbers.  Our projections are phenomenal, but there is a certain amount of conjecture involved. 
The biggest problem with this current project, called Mockingbird, is that it is located in Eagle Mountain, where we just approved a massive tax break for Facebook.  I was originally reluctant to look at another tax break for the same area.  However, Eagle Mountain has more than 10% of our students, and more commercial development is needed to balance out the significant residential growth in the area.  (We get significantly more property tax revenue from commercial entities than we do from residences. This is because your primary home is only taxed on 55% of its value and businesses are taxed on 100% of the property value). Property Tax revenue is a critical component to our funding. The Mockingbird project is located in southwest Eagle Mountain, on property that is unlikely to be developed in the near future. It consists of approximately 80 acres. Currently, Alpine School District receives about $8,450 per year in property tax revenue from this piece of property. The developer is asking that we cap their property tax payments over the next 20 years, with a maximum refunded amount of $12.3 million. Basically, they will pay $500,000 a year ($116,000 the first year and then $500K for years 2-20) in property taxes instead of the total amount due, until 20 years or $12.3 million is reached. After that, we will receive 100% of the property tax value, which is estimated to be approximately $1.3 million per year. Because Eagle Mountain already has a large TIF project (with Facebook), they are already over the maximum amount we would usually allow per area. In order to make an exception to this rule, we have negotiated several more concessions from the company. 1- they will provide us a 10 acre piece of property on which to build an elementary school- before their project is ready to open; 2- when we build that school, Eagle Mountain City will not charge us impact fees to build the school; 3- the company has committed to partner with the district in providing resources to offer programs and opportunities to our students. This will be reviewed on an annual basis- the first year they will give us $50,000 to use toward these programs. (another example of this type of partnership is IM Flash- they donate regularly to our district for STEM needs- and are one of our largest donors each year. They have donated more than $150,000 this school year to various programs). These extra concessions by the company requesting the TIF made it much more palatable to me. In addition, the property that they will be developing is not near current developments, and I believe that in both the short and long term we will be receiving more in property taxes than we would have otherwise. I also like the idea of that 80 acres providing us with 100% of the tax revenue, rather than having homes built there, which would provide less property taxes for us, and would also mean more students that we would need to provide schools for.

Sunday, May 5, 2019

April 29-May 3 Update

Things are heating up for the end of the school year.  We have a lot of opportunities this month to celebrate our amazing teachers, classified staff and students.  I'm looking forward to those events.

Monday night I attended "Newsies" at Timberline Middle School, and it was a fantastic production.  I couldn't believe that some of the voices I was hearing were junior high students.  Mr. Fortie and his students put together a wonderful show, and I was also happy to see Mr. Hollenbach and Mrs. Jolley there to support them.  I love seeing our teachers and departments all working together.

At our meeting with the Superintendent on Tuesday, he said something that struck me.  He was thanking the teacher team that we were meeting with (we were at Geneva Elementary) for the great work they were doing and expressing his support for them and all they do.  He said: "If you are not a classroom teacher, you are support staff."  He meant that everything done by all of our employees (administrators, aides, bus drivers, custodians, lunch workers, and everyone else!) is to support our teachers in making good things happen in the classroom for our students.  This has to be our most important focus.

As mentioned, Tuesday morning I attended at couple of meetings at Geneva Elementary in Orem.  I appreciated the time to ask Superintendent Jarman and our Secondary Supervisors a lot of questions about various things and I really enjoyed meeting with the 5th grade team at Geneva.  Geneva is a unique school and they are doing some great things there.

Tuesday evening I attended "The Drowsy Chaperone" at Lone Peak High School.  Wow.  I had never seen in before, and it was absolutely delightful.  We are going to miss some of these talented students when they graduate!  The production was absolutely superb.  Entertaining and witty, the acting was top notch and everything about it was first rate.  Congratulations to Mr. Smith and the entire LP Drama department for a truly enjoyable evening.

Wednesday morning I dropped in to a faculty meeting at Deerfield Elementary.  They were discussing some of their end of year responsibilities and schedules.

Wednesday evening my husband and I attended the Accent on Excellence Award night for the district.  It was a wonderful evening.  We recognized 12 teachers, a principal and a support staff member for their contributions to their schools.  Each one had a student there to talk about the difference they had made.  The students did an amazing job talking about their teachers, and I am so grateful that we have such wonderful teachers working with our students in ASD.

Thursday I spent the day at Camp Floyd on a field trip with my daughter's 3rd grade class.  My assignment was to help at the schoolhouse, which was built in 1898.  We were able to play some recess games, use our slates to do math and recite a passage from the readers.  It was my first time wearing a hoop skirt, and I have no idea how teachers were able to move around in them.  But we had a wonderful time and I was grateful for the chance to go.

Thursday evening was "Night of Excellence" at Mountain Ridge.  I've always been really impressed by the caliber of students at MRJH.  They had 241students recognized for being on the Honor Roll or High Honor Roll for all three years of junior high- which is about 2/3 of their 9th grade students.  They also recognized students for outstanding contributions to different departments, and honored one student who is currently battling cancer with a "Hero Award".  It was a great evening and so fun to see so many students that my children have grown up with.  They are going to do great things in High School next year!

Friday was a fun day- I spent the morning helping with the jump a thon at my children's elementary school, then went to Munch & Mingle at MRJH for lunch.  That evening Cedar Ridge hosted a Community Celebration and I was able to volunteer there also.  I'm always so grateful for the time that all of our parent volunteers put in to making our schools great!  We could not have the success we do in ASD without our incredible parents and families.