Tuesday, January 12, 2016

2016-01-12 ASD Board Study Session

1-12-2016 ASD Study Session

JB: welcome, passes out some information about engaged learning.  Asks board to read it before the board retreat on Feb 2nd.  Tells them they will be receiving some other information they should be aware of before that meeting that they will need to respond to.

SJ: Welcomes everyone.  Glad they are here to learn more about the Saratoga Springs school proposals.  Dr Patten and Dr Pew will lead the discussion and they will share their plans for all the options they have explored to find a beneficial plan for the saratoga springs community.

John Patten: Has distributed a packet with four options to meet the needs of the growth in the district.  Recognizes that the most time needs to be spent on the construction of the new school in SS and who will be attending it.  Looking down the handout, there are three areas to discuss: 1- Lehi, 2- Saratoga; 3- Vineyard

Item 1: talking about realigning the feeder system for Traverse Mountain elementary.  TM elementary would feed to Lehi Jr instead of Willowcreek.  It will reduce enrollment at Willowcreek from 1858 to 1505 for the 2016-2017 school year.  At TM elementary they will add another portable and remodel the reading recovery room, which would give them a capacity of 1155 for 2016-2017.  (they are just over 1000 now)

Item 2: related to #1.  Add 16 classrooms to Skyridge and include 9th grade.  Lehi Jr would only be 7-8.  Would reduce Lehi Jr from 1518 (if they reboundary TME’s 350 students without moving 9th to Skyridge, they would add about 100-150 9th graders making that number approx. 1650) to 1258.  Skyridge would increase from 1398 to 2013.  The common areas at Skyridge have capacity for that many students, and the addition of the 16 classrooms will give them enough room for classes.  At the community meeting for this proposal, there were over 500 comments made.  They have read through all of those- the favorable responses outnumbered the negative ones by about 3 to 1.  The overall tenor of those in favor was that they appreciated what ASD was doing to accommodate growth, and that they would prefer the larger school to be the high school rather than the Jr High.  The opposing responses were concerned about loss of opportunity for the current 8th graders who will not be able to have 9th grade opportunities at the jr high level (like 9th grade sports and journalism).

SC: in the first item, we are reducing Willowcreek from 1858 to 1505. This area is still growing significantly.  Willowcreek will be back in the 1800 range before we can build another jr high.  It is really tough to fit that many kids.  Without moving TM, they could be above 2000 or 2100.  The solution is not long term, something else is going to have to happen there.  (Shane Farnsworth: even with the move of TM, Willowcreek will still be at 2300 by 2019.)  This change will really help Willowcreek.  As he talks to families in the Skyridge area, many of them are excited about their 9th graders moving up to the school.  They are counting on it.  Some of the 10th graders don’t want to go to school with the “little” kids that they were last year… Of the parents who are expressing concerns, many are concerned that Skyridge will be overcrowded right from the beginning and they won't have room for growth.  Some of the capacity numbers being spread around to parents are not accurate.  Skyridge and Willowcreek will continue to grow, though, and before too long we will need to move the 9th graders to a new junior high school to relieve the growth.
WH: what are the guesstimates on the central facilities at Skyridge?  How many can we accommodate? (Rob Smith 1800-2200 is the ideal.  The actual capacity depends on how you calculate it.  Number of lunches, etc would be a school level decision.)  SC: the central facilities at Skyridge are comparable to those of Westlake and Westlake currently has 2500 students.  WH: LPHS is having a great deal of difficulty accommodating their students in their central facilities.  Are we going to be able to meet those needs at the new school?  RS: Timpanogos and LPHS were built smaller than Westlake and SHS.  They have done some things to accommodate the school size at LPHS.  New gym, trailer, etc. But nothing has been done to the central facilities so that is an issue there.  JP: some of this relates to the culture of the school.  LPHS prefers one lunch, so they let kids eat anywhere they want- hallways, classrooms, common areas, etc.  So they have room for students to eat.  Many kids bring lunch from home, so they don’t strain the cafeteria as much. Other schools want their kids to eat in the lunchroom, so they need more than one lunch.

JS: Has been receiving emails with incorrect info that people claim comes from the district.  We need to make sure that the district is giving out correct information via email and on their website.  Also, the moving of the 9th graders to the HS is something they have done before.  It is not new.  We can do it.  Many of the other HS in the state are 9-12.  It is doable and we can handle it.  Across the country, most HS are 9-12.  This discussion isn't really about whether our philosophy is to have 9-12 or 10-12, just can we do it and it is doable.  As we are working through how to deal with growth, we need to let people know that this is not a fly-by-night, sudden decision. They have been studying it for a long time and how to accommodate needs. In a perfect world, we would be able to do all the things we would like to to meet the kids' needs.  We would have small classes and small schools.  But we can't do that.  We have to keep our eyes on how these decisions affect our students and how kids are doing.  Are they learning and growing?  Are our graduation rates good?  Our teachers and staff are outstanding, and they are helping these students reach their fullest potential.  We need to move forward with confidence, knowing that we have studied and thought about all of this as much as we can to meet the needs of students. 

JP: Item 3: Vineyard.  We have talked about the growth in Vineyard.  They are about maxed out with their portables.  A compounding factor is that there is a charter opening in 2016 and at least one (maybe 2) opening in 2017.  The principal will be doing a little reconfiguring of classrooms, and also reconfiguring how they do kindergarten extensions.  These changes will make more room for next year.  He believes that the school will be fine will 1100 students next year.  The community is telling ASD that they don't want to go to the charter school.  They like the district and trust it.  They will go to another place if they feel it is just too crowded, but they would prefer to stay.  We are bringing back a proposal to adjust the boundaries slightly between Vineyard and westmore.  Westmore still has room for growth.  If you look at the handout, you can see where Suncrest, Cherry Hill, Vineyard and Westmore boundaries.  They would leave Suncrest and Cherry Hill alone.  This change would affect three schools: Vineyard, Westmore and Orem.  There is a neighborhood that is in Vineyard's boundary, but most of the kids attend Orem.  So they would like to pull them into Orem, adding only 10 students there.  (Orem is pretty full, so they don't want to make a significant change to their boundary.)  The boundary for Westmore would be extended to I-15 and to 400 South.  This move would take Vineyard down to 980, and would move Westmore up 107 students.  They have been meeting with Westmore's principal, and looking at what they would need to provide for Westmore.  This would help stabilize the area until they find out what is going on with the Charter school and how it affects us.  The charter will have to have at least 300-350 students to open (a K-6 school) and would like to have 500 at maximum.
JS: It might pull a lot of the charter attending students from Noah Webster rather than pulling ASD students.  It will probably not be a significant impact for us. 
WH: so those kids might go to the new charter, rather than Noah Webster, and we won't lose as many students.
JS: the student body in the green area near UVU (between 4th and 8th South), many of those students are already title 1, and Westmore is title 1, so they would still receive the services they need at Westmore.  Next year, Vineyard will not be title one any more (either way), and will be on a phased out of that system starting next year.  It is helpful to move these kids for safety reasons, they will not be crossing train tracks and geneva road any more.  
BH: could we increase the capacity of Cherry Hill?  Where is that in relation to these schools?
JP: there is a large development being built right now in Cherry Hill boundaries.  It will not affect them for next year, but for the year after there will be a significant change.  Westmore is also gaining 32 homes (townhomes), so that will raise their numbers as well, but not as much.  
WH: Will have community meetings about this change, as well?  JP: we haven't yet, but we will, depending on the direction of the board.  We have to make sure that Vineyard doesn't grow too large. 
JS: we already have kids attending Orem Elementary that are in the area we are moving to Westmore.  Some of those kids may prefer to stay at Orem, or they might want to send their kids to Orem over Westmore.  

JP: anything else on item 3?  Any other direction from the board?  WH: There is always stuff that we can't know.  JB: we will get that feedback from parents later and we can tweak the proposal.

JP: Item 4: new school in Saratoga Springs.  It is safe to say that we have gone the rounds to get as much input as possible to decide who will go to this school.  We have considered a 5-6 school, a 6-7 school, etc.  The feedback was very clear at the community meetings and with the submitted comments.  The public comment is a resounding no on a 6-7 school with an A/B split.  They feel it is too hard for kids at a vulnerable time (7th grade) to be having to figure out two new schools rather than one.  So we confronted the reality that there are many items that would have to be taken care of.  Parents don't like the idea of bussing 10 year olds (5th grade) past multiple schools to a new elementary school.  So we came back to a more serious look at how a K-6 school could be configured to assist with the growth issues they are having in the area.  They are proposing a new K-6 school.  If you look at the proposed boundary, it would open with 826 students.  They will take students from Thunder Ridge, Saratoga Shores and Silver Lake (subdivision).  (Hand out maps of the boundaries)  This proposal would create a non-contiguous boundary, but it creates a good balance between the schools in the area. 
The main issue with this proposal is that it doesn't alleviate the growth at Vista Heights.  The feedback given by the public had them look at other options.  They could possibly move 9th graders from Willowcreek to LHS.  Then reboundary some of the elementaries to Willowcreek from Vista.  If nothing happens to Vista, it will be at 2350 by 2019.  We've addressed Willowcreek a little bit, but Vista is still an issue.  The infrastructure at Vista and Willowcreek would not allow for more than 2000 students.  AFJH has about 2000 students, but they are a much larger building.  We may have to look at something to address the needs at Vista for next year.  Moving forward with a K-6 school does not address that concern.

PH: Feels for the Jr High.  They are very crowded there, and we will need to address that. When you crowd rats they eat each other.  LOL!
DT: Really appreciates the cabinet and all of their hard work.  Really likes this proposal better and feels it would be better for kids.  Appreciates all the thought and time that went into this. 
JP: If we could have done a true middle school with capacity for all the programs, it could have met the needs and been supported by the public, but we couldn't provide that.
SC: Hears that we need to address the growth at Vista, and that is urgent.  We need to find some way to address growth there for the 2016 school year. 
JS: While addressing the elementaries, Vista and Willowcreek building needs, we have some other needs that are very urgent.  We are going to have to find some innovative ways to meet those needs and educate our children to the best of our ability.  We can do this through innovation, but we have got to have the buildings.  
PH: the reality is that there is not enough money to do what needs to be done.  We have to let our patrons know that we cannot build fast enough for the needs. 
JS: The growth in our area makes it hard to keep up with everything.  We just can't keep up with it all.

SJ: Giving Mark Pew the last word on boundaries.  Thanks John Patten for all his information. 

MP: this area is geographically challenging (the Saratoga area).  There are thousands of acres that are undeveloped but will be soon.  There is the lake on the east and the mountains on the west, and the potential for growth means that the boundary looks strange.  But it relieves the schools as much as we can.  We are going to have to have more schools out there.  Doesn't think he has ever made a new school and had the existing schools numbers remain so high.  The growth is just crazy.

SJ: moving on to the next topic.  RS has been working with the legislators, and is hoping to have them here tomorrow morning at the breakfast.  Some of them should be there, and they are hoping that more will come in time. 
RS: my hope is that we can engage our legislators in dialogue.  Come and talk to them.  It will not be as structured as it has been in the past.  He is hopeful that they will come and engage with ASD about what we can do to help.  Thinks there will be 6-8 legislators there. 
SJ: this is meant to be a thank you to our legislators for what they do for us.  They will give a short proposal:
  1. overview of the district- number of schools, area they cover, number of students
  2. cluster system and how they keep the numbers “small” for each area to help with communication and needs
  3. how 2015 legislation positively affected our schools. Talk about what they have done with the WPU increase from last year.  Instructional coaches, benefit and salary increases, social workers, tech support, summer collaboration grants, supplies.  SB 97 and how that helped- class size reduction, etc.  need to release the remaining funds for district usage.  IF they fix the formula, it will help with many growth needs that ASD is experiencing.  Could expand science and engineering growth, provide both devices and coaches for technology usage.  
  4. Invite them to see their pilot school program at Foothill Elementary in Orem.  
  5. Will then turn the time over to Rob, where they could do an open format about what ASD can work with legislators to meet the needs of kids to the best of their ability.

SC: in the beginning, we talk about the size and the growth in the schools.  Then we switched over to clusters.  In between, we should talk about how we are really efficient and talk about what else we can do because we are a big district.  East Shore, Polaris, Dan peterson are tremendous successes and efficient because we can pool our resources to provide those services.
JB: Break for dinner.

No comments:

Post a Comment