Tuesday, September 11, 2018

2018-9-11 ASD Board Study Session


2018-09-11 ASD Board Study Session



Sam Jarman: welcome, turns time to John Patten



  1. Enrollment highlights
  2. student summer programs
  3. educator summer learning
  4. new teacher orientation and hiring
  5. Employee celebration & PD Days
  6. Opening two new schools



Enrollment Highlights: Growth from October 2017- 1,129 students.  (Hands out enrollment numbers as of September 5.  They can be found here at the very end of the documents: https://drive.google.com/drive/folders/1aIPhLzztDOEW5GDABkgxYkWK-lbMfeN0 ).  Some things to notice- the Yellow column is the total number of students per school including the self contained units.  After that we have the projection and then the current number- projection.  That lets us know how close we came to the actual number.  What do you notice?  (Brookhaven is 241 students over projection; Springside is 101 students under projection- those students probably went to Brookhaven, which pulled from Springside, Pony Express, Black Ridge and Thunder Ridge).  For Brookhaven, we had a hard time estimating how many new students there would be there.  We brought in a portable, but it is now maxed out and we may have to look at a boundary adjustment for them for next year. District wide, though, we were only off 237 kids in Elementary- and only 109 for the entire student population.  This is phenomenal with more than 80,000 students. 



Quick Facts:

89 schools- 59 Elementary, 12 Jr/Middle, 10 HS and 8 specialty schools

9,019 employees- 3652 Teachers, 3369 hourly classified, 1519 contracted classified, 257 Other certified and 222 administrators.



Summer programs: STARS was in 11 sites, 13 classes.  They hosted both Kindergarten classes and 1st grade classes.  The K students had an average of 6.5 months gain in ability and the 1st grade students had a 4 month average gain. This is for three weeks of class. 

SIMS- (Summer Initiative to motivate Students) 8 sites, 16 classes. about 25 students per site.  

High School Extended year programs- MV and Lehi (Held at Orem Jr and Lehi Jr because of construction).  MV: 616 students enrolled with 2006 credit attempts.  3.25 per student.  1543 Classes were made up with an 86% pass rate.  233 credits were remediated and 152 credits accelerated

Lehi: 444 Students with 1026 attempts.  952 classes completed with a 93% pass rate.  188 classes were remediated and 50 were accelerated.

Would another site be valuable?

Adding another site would be tricky- there are several variables that would need to be considered- where the students are coming from, what teachers we would need, where the program is needed. 



Educator Summer Learning:

Elementary Schools have been split into 4 Cohorts and the training process is going through by cohort.  Secondary schools received training based on subject and each group received a different number of days.

June 2019 Teacher PD plans are being set up now so that teacher will know what they will be able to count on for next year.



New Teacher Orientation:
405 new teachers attended.  They received a small stipend for attending.  Hiring Summary- we hired 706 teachers and interns this year, compared to 672 last year.  Currently we have 18 teaching positions still open (10 special ed, 3 specialists, 3 hourly, 2 elementary).  Classified we have 116 total positions open- mostly custodial/sweeper, special ed aides, office/classified aides and nutrition services.



Employee Celebration & PD Days.

These were held on a school level this year.  Thanks the board for their participation in these days.  Held the 1st session of the Alpine Instructional Coaching Academy.  They have patterned it after the BYU Coaching Academy.  2 cohorts were formed, have about 50 coaches each.  They are the newer coaches.  To date we have 45 elementary coaches, 19 partnership facilitators (support interns mostly), 21 innovative learning coaches, 40 PLC Coaches- mostly secondary.  3+ secondary content coaches (for new teachers of English, math and science).

Mark Clement: Are principals primarily responsible for their coaches and the scheduling of their time?  Garrick P- yes, some of them are part time coaches so they try and work their teaching schedule so they can coach certain hours and teach the others.

Canvas Usage Update: What has been the benefit so far of these coaches?  They were invaluable for PD days over the summer and also to help teachers as they begin to use Canvas.  There has been a great desire from our teachers to use Canvas, and the innovative learning coaches have been instrumental in helping with that. 



Opening Schools-

New Schools were mostly covered in the enrollment report.  Shows a lot of pictures of the first day at different schools. 



JoDee Sundberg: Would like to go back to Enrollment and look at some patterns there.  Concerned about the Orem schools.  Orem and Westmore gained students, but they gained them from Vineyard.  Aspen is a concern, their numbers are down and so are Geneva and Suncrest.  We need to be very aware of what is happening there, and make sure that those students have the same educational opportunities as other schools.  MVHS and Orem HS are exactly the same size right now- 1256 students.  There are other interesting trends.



Mark Clement: happy to see that LPHS is a little bit down.  IF they had gone up much more we would really need to do something there.  WH: maybe they are finally going to start going down.



Scott Carlson: it might be a good idea to do this report with the schools grouped by cluster.  That would help us have a good idea of what is happening in each area and what the needs might be. 



Sam Jarman: Thanks John for a great presentation. Welcomes Jess Christen to present about the Energy Program with Cenergestic and how that is going.



Jess: July 2017-June 2018.  We signed an agreement with this energy company last year and it began in July.  We believe in a leadership team in ASD, and so we have an Energy Management leadership team- includes Jess, Frank from Buildings and grounds and Frank from Cenergestic.  Each of them heads up a team that works with our individual schools to help make the program successful.  (Jess- Principals; Frank- energy management team, HVAC techs, Energy Managers.  They meet weekly and coordinate needs.  Cenergistic team meets with Sean weekly to find out needs.

The goals for the program were to improve comfort, reduce carbon footprint and to also save money at the same time.  How can we improve comfort while also meeting our other goals?  Optimize mechanical systems, use the energy we need, but need the energy we use (eliminate waste), Turn off equipment when not needed, Change set points 1 degree, set dead bands 3 degrees.

The first thing we need to decide is if the comfort issue is a mechanical issue, a scheduling issue or a training issue.  This would help us know how to fix it appropriately.  We want to make sure our custodians are trained to know what they can do to fix problems and when they need assistance.  Each building is unique and has its own positives and negatives.  So you can’t set a blanket policy for each building.  We’ve learned that we can’t communicate enough.  We need to keep communication open so we can fix whatever comfort issues that arise.  The cabinet approved adding some money to the HVAC budget so we could fix some mechanical issues that needed to be addressed. 

We’ve attempted to hit the low hanging fruit (so to speak) in this process, so we are pleased with the current results, but we are not yet satisfied that we are where we would like to be.  We would like the High Schools to be close to $1 per square foot.  So far we have managed to cut about $800,000 from the raw cost.  The Cenergestic fee is 50% of the savings, but with the personnel they are providing and the work they have put in so far, it will probably be a couple of years before they start making much of a profit. 



Mark Clement: thinks that this first year we are just getting used to things.  Would love to see the raw data from the schools.  (The $800,000 in savings is the raw number.  This means that we have spend that much less last year, even though we opened new schools.  So we are managing more schools for less money than we did before). 



Wendy Hart: brings up a concern from a school.  Are we making sure that the buildings are comfortable when the teachers are there as well as when the students are?  The teachers are there more hours than the students are. 



Jess: we’ve run into that issue- ie teachers staying late and the building being uncomfortable.  But it is possible for the custodian to set up a schedule that allows for any extra curricular activities that will be happening in the building.  Also, it should be an hour or so before the building begins to really change temperature.  That leaves some flexibility for those exceptional times. 



Meeting closes.

No comments:

Post a Comment